All projects

Rail 2021

Three Bridges ASC ARS

Network Rail · Alstom

Automatic Route Setting to cut signaller workload and delays; led re-programming and on-site night-shift commissioning.

£6m
Rail 2019–2021

Feltham Re-Signalling Phase 1 (GRIP5–8)

Network Rail · Atkins

Richmond–New Malden renewal; led four supply-point packages (~£1m); Commissioning PM, Easter 2021.

£34m · target cost
Rail 2020–2021

Feltham Re-Signalling Phase 5 (GRIP4)

Network Rail · Atkins

Multidisciplinary design; led risk, estimate, WBS/CBS, programme and change control.

£2.5m · fixed price
Rail 2021

Parsonage & Littlehaven Level Crossing Re-Control

Network Rail · Alstom

Control-system data and hardware re-control to Three Bridges ASC.

~£1m
Rail 2019–2021

Basingstoke ROC ElectroLogIXS Training Centre

Network Rail · Atkins

Network Rail's first ElectroLogIXS training centre, GRIP5–8.

~£1.5m
Aviation 2025–present

Pre-Conditioned Air Units Improvements

Heathrow T5 / Ferrovial · Jacobs

Aircraft-stand serviceability and docking reliability; led interface management.

~£1m · lump-sum D&B
Aviation 2025–present

Airside Pedestrian Crossings Phase 2

Heathrow / Ferrovial · Jacobs

Airside pedestrian safety; design plus Road Safety Audit Stages 2 & 3.

~£1.5m · lump sum
Stations 2026

Walkden Station AfA (ES4)

Network Rail · Jacobs

Step-free access via a new lift facility and layout renewal.

~£500k
Stations 2023–2024

Cottam Parkway Station (ES4)

Network Rail · Jacobs

PACE ES4 preliminary design across ~20 disciplines; value engineering.

~£1.5m · lump sum
Stations 2024–2026

Burnley Manchester Road AfA (ES4)

Network Rail · Jacobs

New footbridge with lifts and stairs; fire strategy.

~£500k
Stations 2025

Cheadle Station (ES4)

Network Rail · Jacobs

Tender-stage surveys and Approval-in-Principle design for a new station.

~£1m
Highways 2025–2026

Bus Priority Programme

TfL · Jacobs

Programme reporting, commercial management and QA.

~£1m · T&M
Highways 2017–2018

Regional Investment Programme

Highways England · Atkins

PMO for five major motorway junction upgrades.

~£400m · programme value
Highways 2017–2018

M20 & M23 Smart Motorways

Highways England · Atkins

Cost reports, EVM, change pricing and invoicing.

Highways 2016–2017

M25 Junction Improvement Programme

Highways England · Atkins

Chaired reviews, produced client reports and applied Lean tools.

Depots 2023–2024

Manchester International Depot Signalling (ES3)

Network Rail · Jacobs

Option selection separating routes between two operators.

~£150k
Depots 2022–ongoing

FLOW/WOLF Footbridge Programmes

Network Rail · Jacobs

Reinforced-polymer footbridge product development; first site delivery.

~£1m
Depots 2022–2023

GMPE Depots Surveys & ES4/5 Design

Network Rail · Jacobs

Depot energisation; surveys plus PACE ES4/5 design.

~£900k